8-Building HOA Switchgear Upgrade with 64 Sub panel Replacements – San Diego

Eco Electric San Diego completed a full electrical modernization for an eight-building HOA community, replacing outdated switchgear and 64 hazardous Zinsco subpanels. Our team coordinated all homeowner scheduling, SDG&E shutdowns, inspections, and communication ensuring every upgrade was completed safely, efficiently, and with minimal downtime. This project protected the community from insurance loss, eliminated fire-risk equipment, and delivered a fully compliant, future-ready electrical system.

CA Botana

This project involved transitioning their operations from a 35,000 sqft to a more efficient 25,000 sqft warehouse. Key aspects included designing and installing three-phase panels, circuits, and custom lighting solutions for enhanced functionality and aesthetics in the front desk area and lobby